The piling rig is getting into its stride as it lays the foundations in the area that will eventually be our hotel reception. It’s sometimes good to focus on what the end result will be!

 

 

 

Masshouse Lane piles now complete

Completion of Masshouse Lane piles

In the background to the left you can see the continuous retaining wall holding the upper level. It may not look much but, to us, it’s pretty significant. The line of piles down Masshouse Lane is complete and the first of the pile caps are cast on top of them, connected by a ground beam. They’re ready to support the outer edges of the building.

 

 

 