Another first

First in-situ concrete wall

It'll look much better when it's finished

The first in-situ concrete wall is cast to form the side of the passenger lift shafts up to the conference level.

It’s also a grand day for us as two tower cranes – 40m and 50m high – are erected up through the centre of the building. They look pretty close together but are computer controlled not to clash. We need two of these giants so we can eventually construct the two bedroom wings in parallel.

 

 

Our cranes dominated the skyline

Here come the cranes

 

 

No comments yet
Comment
Enter your details below to comments on this article...

* Required Field

You might also be interested in